Power UNITS FOR DOUBLE-SCISSORS LIFT

Common Description
Outfitted with the zero leak bidirectional checking sole-noid valves, this energy unit is developed for the operation of two independent circuits. Which are respectively for the principal and subordinate platforms in the double scissors lift. Two cut-off valves are applied for reducing the machine manually in situation of electrical power reduction. If extra independent circuits are needed for your application please speak to us for availability.
Remark: one. Please talk to our revenue engineer for that diverse pump displacement, motor electrical power or tank capacity.
two. CSA or UL licensed motors are available on request.
Specific Notes
1. The AC motor is of S3 duty cycle, which may only perform intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic components concerned prior to set up of the energy unit.
3. Viscosity in the oil shoud be 15~46 cst,as well as the oil must be clean and free of charge of impurities,N46 hydraulic oil is encouraged.
4. The electrical power unit need to be mounted vertically.
five. Check the oil level from the tank soon after the preliminary operating of your energy unit.
six. Oil altering is required soon after the original 100 operation hours,afterwards once each and every 3000 hours.